Wednesday, 13 October 2010

Toilet number 5

Here is our family bathroom.



OK - so that was a few months ago. Things have progressed since then. Here it is now...



You will note that the toilet is - how can I put this? - incomplete. Here is the story.

Toilet #1
We bought a toilet in the sale. Turns out that, due the structure of the wall behind the toilet the design of the toilet was wrong: it needed to have a side turn, rather than straight back. Thankfully, company happy to take it back and change it for...

Toilet #2
The replacement toilet ticked all the boxes per the catalogue, but in reality the pipe at the back still went the wrong way. No decent alternatives sold by that company and so bought a new toilet elsewhere. We are most grateful that they were still happy to refund us for the toilet(s) bought.

Toilet #3
Fitted perfectly ... but a crack in the pan. Replaced by...

Toilet #4
Which is what you see above. No cracks, pipes heading the right way ... but holes for fixing the toilet seat have been manufactured incorrectly, so that it cannot be fitted. The company's specialist came to have a look at it last week (full of bluster that it can't possibly be wrong) and broke the fixing.

So we head towards Toilet #5 ...

Wednesday, 6 October 2010

A room with a view

At long last, we clear enough room to put the dining table with four legs on the ground. We still can't access the chairs all around it, but there is a row of three crammed between the table and the wall, more like a bench than a seating arrangement. The room is madness: filled with boxes and furniture that has not yet been taken to the right room. As the builders are still in and out of the house I have designated the utility as a space for them to leave boots and equipment and spare parts, so all the washing is hung on the other side of the table. Anywhere else and it would be filthy in seconds: here I feel I have some level of control.

There is a rare moment of wakefulness in the morning and my daughter lays the table for breakfast. She places three bowls in a row, and insists that Mummy sits next to her. My son sits on the other side, a cosy threesome in the chill morning air (we can't yet shut the window properly).

"Isn't this lovely," I say, "all three of us together."

My daughter giggles. She's delighted, cuddling up to me. There is more reluctance from my son.

"Yeah," he grunts, "and looking at Dad's underpants."

Must, must, must find alternative space for drying clothes...

Friday, 1 October 2010

Practical completion

We achieved Practical Completion last Monday ... only 3 weeks after moving in ...

During those three weeks I have had builders, of one description or another, in the house every day of the week (except Sunday: ah, the day of rest...) Practical Completion is a technical - possibly legal - term for the end of the first phase of our contract with the builders. Now the building is complete and habitable, all the jobs done and simply a minor snagging list left to do.

Logically (of course) since reaching it I have continued to have builders in every day of the week...

Outside, diggers and dumper trucks were hired to level the front garden and bring some sort of normality to the side path. In the process they have ruined the back garden, but it is hard to get too cross about it as it was always muddy and squelchy. It would be better if I didn't need wellies to hang out the washing but I guess you can't have everything!

Inside the plumbers have been busy. Or, more often, the handyman has been busy fixing the plumber's problems. The boiler/solar panel suppliers managed to flood the airing cupboard with glycol, which leaked into the toilet below. Despite everything, the relevant pipe has leaked in two places ever since: I think it got fixed a couple of days ago, but I must check! Two leaks were found under the sink in the utility, a leak behind the downstairs toilet, a leak in our en suite basin and (best of all) a leak behind our en suite toilet. That leaked down into the family room below ... another brown smudge on the pristine white walls. It was fixed late on a Thursday with 24 hours for the seal to dry. Of course, no builders are prepared to work after 4pm on a Friday so an entire weekend without the en suite (and without the kids bathroom, as that drained into the same place) followed.  Oh ... and then they didn't actually send anyone to fix it back properly until the following Wednesday: nearly a week on.

Don't think I'd recommend the plumbers.

Joiners were around for the first couple of weeks, dodging the decorator who didn't want sawdust flying around near his newly glossed doors and floors. We are still waiting on the door handles (that we could have ordered and got within 2-3 weeks but the builders said they would get ... now we are 5 weeks and counting!) The electrician finally got around to putting light bulbs in the fixings last week. He still refuses to put up the lights we bought for our en suite as he claims they are not suitable for Zone 1. That is very irritating: he does have the final say, but all the regulations are ambiguous, and as we have to have our electrics signed off it means another £150 or more to replace lights we've already bought. Grrrr...

Don't think I'd recommend the electricians either.

Yesterday the guttering was finally completed. The entire render on one wall had to be re-done, it was so poor, which delayed fixing the gutters on top. I believe we are still waiting on a dry day or two for the other two rendered walls to be repainted. Looking at the weather today, I imagine we are in for a long wait! All the rendering and re-rendering has ruined the outside paintwork, so I am going to have some upset decorators back on a subsequent dry day to redo all their hard work.

Wouldn't recommend the renderers.

To be fair, I'm not sure which, if any, of the workers we've had on site that I would recommend. They are all lovely people, but each and every item has foolish errors in it. Door handles in the wrong place, threshold strips that are cock-eyed and 10cm from the door itself. Paint all over the light switches. Gaping holes in the plasterwork between sockets. Mucky fingerprints left in wet paintwork. Erroneous nails sticking out all over the place.

I seem to have had disasters with everything. The broadband didn't work when reconnected and after a couple of hour-long phone-calls it had to be switched off and on again at their end, and miraculously things began to communicate properly. The Aga lid has a chip in the enamel. The heat recovery system is now using small grills not large ones, and there is anxiety about the false ceiling, and the hugely expensive box that makes it work was left outside in the rain by the builders. The freezer wouldn't freeze: after a week of being on it had reached about -3 degrees. (This is after I had spent a day cleaning it. It had spent the previous 6 months in the builders' container. Unfortunately, in their wisdom, they had left a half-empty pint of milk inside it back in March. It reeked! On the positive side, it shows the seals on the freezer are in good condition; on the negative ... oh, the smell, the brown dripping gunge and the general feeling of queasiness whenever the door was opened. Bleuch.)

We have reached Practical Completion, and we are practically complete. The list of 131 items that need fixing is alive and active ... but we are getting there.

(And it is gorgeous. Really. Deep down, somewhere beyond the dust and dirt.)

Monday, 27 September 2010

And then chaos reigned

On the morning of the move I prayed that there would be no rain. God answered this prayer, providing an unexpectedly warm, sunny day - except for one hour of magnificent thunderstorm whilst we were at a school meeting about our daughter's progress (Doesn't everyone squeeze in important educational meetings on the same day they move house? Really? It's another post altogether, I'm afraid.)

Yet God must have been laughing. "OK, I'll keep the rain off the move, but the payback is (a) no running water in the house by morning and (b) rain, rain, rain all night."

The running water meant we couldn't flush the loo. Again, this might have been all right if it weren't that our en suite bathroom has no door between it and our bedroom. A gentle aroma wafted through ... It also meant the children were unable to wash before the morning, so the next day started with a dash to school to use their toilets and washbasins to rinse off the previous evening's dirt.

The storms through the night would also have been fun if the builders had completed the guttering and downpipes. I was woken about 3am to the sound of dripping water and couldn't sleep for hours until it stopped. I now have an understanding of the terrors of water torture: I would have sworn to anything in order to make it cease.

Exhausted, I started the working day with a meeting about parts for the heat recovery system. In its wisdom our suppliers had decided (between our ordering and installation) not to issue certain switches any more, resulting in a bunch of useless electrical wires hanging out around the house and a cross client. Whilst the representative was explaining the alternative options to me and the architect, my architect got a phone call. The building company had decided to sack my site manager.

The day was a bit of a whirl after that. The site manager had gone off sick the day before, but came back to collect his things and say goodbye. I'd always had a good relationship with him, although I cannot deny that I was cross that the house was not completed on time. Was that his fault? I don't know. Some blame must also lie with his supervisors, who should have been monitoring and pushing in a more timely fashion. Was that a sackable offence? Perhaps. But during the day all sorts of other stories come out of the woodwork. I still don't know the truth. All I know is that I was left in the lurch.

What doesn't magically appear is a completed house. Around 3pm I asked the joiners who was in charge on site. They looked at each other and around themselves, then looked at me. "You," seemed to be the reply. No managers from the building company showed their faces all day. My architect was excellent and stayed until lunchtime, but after that I was on my own, trying to encourage the joiners, electricians, plumbers, decorators and external diggers to complete everything in some sort of logical fashion.

The kids and I ended up going for fish and chips for tea. It was a lovely, warm evening so we sat outside the shop to eat them. I dreaded going back to the chaos inside our home. At least the water problem was solved: the electrician put the pump back on. But all I could foresee was me organising the rest of the build, and I wasn't sure I'd paid all that money to a supposedly reputable building company for that to be my job.

Sunday, 26 September 2010

The move - Part 2

Tuesday dawned.

I'd heard the weather report. Storms. Rain sweeping up from the south-west. The North-West was going to be wet all day. I prayed that it would be dry for my move: I didn't want mud inside my beautiful new house.

It was the standard morning routine: husband left for work at the crack of dawn; I battled to get the children up and dressed, fed and out of the house before 8.15. My friend (very tolerant of an early start) had offered to take them to school, so I could meet with the architect at the house at 8.30. In the melee of getting the kids ready I missed a call from my site manager on my mobile. I listened to it as we walked down the road.

He said that the floor was still wet: the varnish was tacky. We couldn't move in.

My home is in boxes. My children are sorted. My removal men are due. My friends are organised into helping. But my house - hallway, living room, landing and spare bedroom - are all inaccessible.

The rooms aren't the problem. The problem is the hallway and landing. Getting to site the architect and I make an assessment. Upstairs was done first, so is drier. Putting down some rolls of cardboard there it is okay. However, the plank of wood from porch to first stair, set at a jaunty angle, is no comfortable route for removal men to carry heavy beds, boxes and furniture.

The architect and I have a quiet word. If we put all the downstairs furniture into the family room (it has a French window we can bring everything through) first, perhaps the varnish will have dried. If I can delay the removal men by a couple of hours, better still. The kitchen is filthy. In a typical male fashion, the site manager has arranged for a top-to-toe clean on the Wednesday - the following day! There are piles of dust covering the kitchen. "It's clean underneath," says the site manager, helpfully whipping off some of the card that covers my precious kitchen surfaces.

The kitchen, shortly before we moved in.


Finally I glimpse what it should look like. (But he was wrong about the cleanliness.)

The site manager is deputed to find a cleaner to come and clean the kitchen, whilst I go home to finish packing. I have two friends there already, so we grab brush, mop and cleaning materials and head back to tackle the kitchen. Who needs to pack when there is little to move in to?

Cutting a long day short, I have wonderful friends and rubbish builders. The removal men finally finished putting up our bed about 8pm, as the light faded completely. The builders hadn't put light-bulbs in the sockets, so it was getting most gloomy. The only lights that worked were the ceiling spots (well, most were in the ceiling: a few hung down from wires and many were at odd angles).

As I went to get the children I delighted that we were actually in ... but knew that this was just the beginning of a long haul to get the house finished. Everywhere I looked there were errors or tweaks or simple disasters to be resolved. The electrician had left us with a few circuits working. We had no door handles and, in many cases, no locks on the doors. We were tiptoeing over cardboard runways, hoping not to damage the floor underneath. Half the house still needed to be painted and glossed. And I haven't even started on the chaos that is outside: mounds of earth and rubble, no portaloo for the workers, mud squelching a path around the building.

Still, we're in. And that's good. Right?

Yes. But discovering before we went to bed that we had no water was not so good.


Tuesday, 21 September 2010

The move: part 1

There's a gap in the building works - I have electricity and am (at long last) updating my blog.

Not that I've been without electricity entirely this last two weeks, though at times it has felt that way. To reassure anyone who worried when the man on the Today programme yesterday spoke about the risk of solar flares, and how one big one could destroy the world's electronic system entirely (apparently we'll have about 20 minutes warning - barely enough time to back-up!), it is possible to survive without most of what we consider 'normal'.

It's just not necessarily pleasant.

My last blog post was a gripe about deadlines. Or their ability to be missed. Our builders are still missing them, into their eighth week of overrun. Since I last wrote we have actually moved in (given the rental contract was up there was little choice!) but our belongings remain, for the most part, in boxes. Today I just had decorators; yesterday joiners and electricians; but someone to fix the mess following the plumbing leak would be useful (I'd like to use the toilet!)

All this industry for a house that was, supposedly, perfect and ready for us to move into two weeks ago. Having moved a few bits and pieces in that previous Friday we were optimistic. We popped in over the weekend a couple of times, being assured that the stained and varnished floor would be dry before we move in. I only got a little irate about finding a man kneeling on the floor with an electric saw, slicing lengths of wood, scattering sawdust everywhere, just next to my sofa. My request for a dustsheet to cover it had fallen on deaf ears.

It is never fun, moving house. I should know: we calculated that in 13 years of marriage we have moved 11 times. Too often, I say. But this is our 'forever house' - I hope - so the weekend of packing boxes, trying to keep out only the most important things, labelling everything: yes, it will all be worth it, I kept telling myself. I organised an army of girls to help me with the move, given that the builders' delay meant my husband was back at work and unable to contribute during the day. They were great, helping to finish packing at one end and unpack at the other.

At least, that was the plan. Then Tuesday happened.

Saturday, 4 September 2010

The value of deadlines

My children have successfully completed their 'Space Hop' Summer Reading Challenge at the Library. They've each read at least 6 books within the two months the challenge lasted. My own reading challenge has been less successful: only completing three library books, although I am halfway through another two at the moment.

The bigger deadline (the completion of our house refurbishment) has also come and gone. Contractually due to complete 30 July, revised to 20 August (bearable), re-revised to 31 August (unsatisfactory), changed on 30 August to be 1 September... until yesterday we were due to move in. That deadline has also come and gone. The final revised and largely immovable deadline for moving is this Tuesday (our rental agreement expires!) If you looked at the house today you would wonder how on earth that would be feasible. All in all it is making for a depressing weekend.

The depression is compounded by the workers downing tools on Friday lunchtime as (allegedly) they hadn't been paid. That crisis appears to have been dealt with by the building company, since they were all back on site this morning, but it made for a very uncomfortable afternoon and doesn't inspire a lot of confidence. The boss assures us it will be ready on Tuesday, but I fear all the workers are worn out. This means they are not working at optimum speed and the final push to complete is being done without any fuel in their tanks.

The deadline to be in before term began has passed. The house is packed and we are living surrounded by boxes. Now I am just hopeful that we will be in before we have friends for dinner on Saturday! 

The failure of this deadline has a knock-on effect. I had set a personal deadline of September to being resending my book to agents and publishers. The chaos at home means I simply can't get my head around it. I had also planned to revamp the blog: I shall be lucky if I have internet access after Tuesday, so another delay there. We have so many activities and visits planned for September and October that we will be lucky to draw breath - yet we need a secure home base to work from!

So, we plod on, step by step, day by day. When all is resolved, we will be living in a stunning house and all these trials and tribulations will be something to laugh about over dinner. Perhaps with friends on Saturday ... definitely by Christmas (do I speak too soon?)!

In the meantime, I might get back to my books: at least they take me away from my worries in this world and transport me to someplace else!